Shenandoah Wastewater Treatment Improvement

Shenandoah, IA

Price Electric provided comprehensive electrical services for the Shenandoah WWT Improvements project, including labor, materials, and equipment in accordance with detailed plans and specifications.

Key contributions included power distribution, temporary power setups for trailers and dewatering pumps, installation of Aeromod and Vulcan control systems, underground conduit work, and coordination with manufacturers for system startup and testing.

The scope also covered demolition verification, generator supply, and integration of pneumatic tubing systems, showcasing Price Electric’s commitment to precision and reliability in complex infrastructure upgrades.

Technical Details

  • Temporary Power: Supplied for up to four general contractor trailers and eight dewatering pump skids, utilizing existing facility power where available.
  • Control Systems Installation: Included Aeromod VFD cabinets, DO probes, mixer control panels, algae control boxes, and Vulcan screen and grit control panels.
  • Electrical Distribution: Power, lighting, and outlet systems installed per the project plans.
  • Demolition Scope: Verified deenergized feeders
  • Generator Supply: Permanent generator and diesel fuel provided for site operations.
  • Pneumatic Tubing: Installed schedule 80 PVC and pneumatic lines for sludge and grit systems.
  • Startup & Testing: Coordinated with manufacturers to ensure proper system functionality.
  • Underground Excavation: Completed for electrical conduit installations.
  • Integration Package: Supplied HOA integration for system control.