Price Electric started this brand-new Indianola Water Resource and Recovery Facility in the summer of 2020. We worked in conjunction with Williams Brothers Construction, the City of Indianola, and many other contractors.
Over a 30-acre site. the project consists of 9 buildings.
This includes an administration/vehicle storage building with administrative area, control room, offices, IT room, training and breakroom, locker rooms, mezzanine, and vehicle storage bays. A headworks building with screening, influent pump room, flow measurement. A grit removal building with flow measurement, diversion gate, two-stage oxidation ditch, secondary treatment building, ultraviolet disinfection building, aerobic digesters, solids processing building, biosolid pumping station, return pumping station and peak flow treatment building. The site also includes a 1750KW Caterpillar diesel generator, fiber pulls, site lighting and multiple controls systems.