Oelwein Grain Bin

Oelwein, IA
Contractor: Larson Contracting - Lake Mills, IA

Price Electric was contracted to do the electrical construction for three new grain bins, two of which are the largest in the state of Iowa at 1.3 million bushels each.  Price Industrial wired a semi dump pit, three grain legs, cross conveyors, dryer, and a rail car loadout system. We also installed three Motor Control Centers, as well the PLC System Controls, and a 3000 Amp 480 Volt three-phase electrical service.