The Venice Gardens Water Reclamation Facility (WRF) Effluent Transfer Pump Station project took place in Venice, Florida.
Price Electric handled the demolition of three 225-amp outdoor disconnects and three indoor 75-horsepower variable frequency drives (VFD), along with all associated conduits and wiring.
Our team then installed new conduits and wiring to accommodate four 75HP VFDs and integrated four new 225-amp stainless steel disconnects with a smooth transition from above-ground to underground conduits.
Additionally, new control circuits were introduced for a comprehensive system integration.